From: route@monster.com
Sent: Friday, April 08, 2016 12:14 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 PMP
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Ghada Elbadrawy, PMP 43546 White Cap Ter, Virginia (571) 501-9885 gbadrawy06@yahoo.com SUMMARY OF ACCOMPLISHMENTS: § PMP Project Management Professional Certified by PMI
earned March18, 2010. PMI member PMIWDC Ch § Studying for Systems Engineering Professional Certificate ASEP with
INCOSE § Implemented the integrated schedule for I495 Express Lanes
construction/System integration. Responsible for compressing the schedule
professionally 30 calendar days to open the Express Lanes by Nov 2012 instead
of Dec 2012 and worked around and planned all the impacted stakeholders
tasks. § Planning and scheduling using the Critical Path Method (CPM),
implementing the baseline schedule and monitor its progress using MS
Project 2007, 2010 and Primavera (P3), (P5) & (P6). Scheduling
analysis and evaluation using STEELRAY, IRIS and SCHEDULE CRACKER software
based on the 14 points of Assessments and Critical Path and Logic. § MS Office. Advanced Excel skills (functions and Macros), implement
Pivot tables to use it actively in cost analysis which lead the CAMs to make
related decisions § GD EVM Certification. § Experienced with the US Army Corps of Engineers (USACE) systems and
processes IDIQ Design/Build Contracts and well versed with the QCS and CQM
Quality Controls Management program. § US Citizen EDUCATION §
BS Civil Engineering - CAIRO UNIVERSITY, May 2000
(Accredited by WES to USA BS Civil Engineering). Studies in Project Roads and
Airports Design §
PMP Certified 2010, MS Project Level I and Level
II certificates 2010 §
MS Project, Primavera P3, P5 and P6. STEELRAY and
SCHEDULE CRACKER software proficient EXPERIENCE Jan 2013 – Present; Advanced Integrated Cost/
Master Scheduler, General Dynamics AIS § Implemented Integrated Master resource loaded schedule for $30M
Imagery Systems Engineering IT program. § Implanted the monthly cost reports using Earned Value Management (EVM)
measurements to analyze the current period and cumulative Estimate at
Complete (EAC). § Used MS project, STEELRAY and Micro frame Project Manager (MPM) to
implement Plan and monitor / control the IMS. § Implemented Baseline change BCRs on monthly bases for the Control
Account Managers (CAMs) and monitored/ used the undistributed budget or
planning packages. § Implemented monthly analysis cost reports EVM using WInsight. Helped
the CAMs to understand overruns/ under runs Cost performance Index (CPI)
& Schedule Performance Index (SPI)and root cause and make decisions
accordingly. § Acted as Primavera SME to implement the software P6. § Demonstrated and improved Risk Analysis Management and impact
calculation. § Maintained internal GD tools for project controls like Program log /
UB log and risk management logs. § Led CAMs team meetings to discuss program issues and for Earned Value
Management analysis and impact using EV workbook, which is a GD tool. § Implemented IMS schedule using Agile approach, and with the CAM,
managed the Requirement Traceability Matrix using the JIRA tool and reflected
that in IMS in accordance with INCOSE systems engineering management
guidelines. Nov 2010 – Jan 2013; Project Control Engineer,
Estime Enterprise Inc. (Transurban
Inc.)
Project:
I-495 Capital Beltway HOT Lanes, Client: Alexandria, VA § Managed the Integrated Unified Schedule for the I-495 Capital Beltway
HOT Lanes Project using Primavera software systems congruent to VDOT
requirement. Developed project schedules and analyzed baseline schedules,
prepared look-ahead reports, what if analysis, and critical path tasks
analysis. § Broke down the high levels of the WBS iterated life cycle of the
project with System Integrator, Operations team and Marketing team Traffic
Management Systems (TMS) design using MS Project 2007. Document control using
TUPORTAL. § Scheduled and coordinated the integration activities with the SMEs in
design and operations to incorporate in the master integrated schedule
realistic time frames, using Primavera scheduling tools. § Submitted progress updates for the TTMS Traffic Management Systems
project schedule as part of the monthly reports to the Client using Primavera
P3, implemented what if analysis, cash flow and look-ahead reports. Reviewed,
analyzed and evaluated the subcontractor System Integrator schedule and EVM
report and incorporated the progress to the internal integration schedule and
external reporting schedule. § Implemented bimonthly status reports for the board meetings that
incorporated status of the System Integrator, Operations and TMS Design
teams, Corporate Relations, and integrated schedule. § Identified risks using SWOT Analysis, assumption analysis, Critical
path, response strategy, root cause, risk owner, category & priority. Oct 2008 - July 2010; Project Manager, T.A.S.
Exporting Inc., North Carolina § Managed program budgets and negotiated contracts. Oct 2006 - Apr 2008; Project Manager (PMO), Venco
Corp
Inc.
Client: US Army Corps of Engineers, Afghanistan Hospital Project (Kabul), Barracks Camp, water
& wastewater treatment plants, roads network (Heart) in Afghanistan under
USACE; Project value, 50 million USD. The construction team consisted of 15
expatriates and 1,000 local Afghans (Venco Corp). Gamberi Afghan Army Base
Jalabad, Afghanistan (Red Sea Inc.) § Implemented the WBS, baseline schedules, monitored and updated the
progress, leveled the resources when required. Implement reports for Gantt charts,
critical activities, CPM, PERT, EVM, EAC using Primavera. Conducted the RFIs
to the USACE. § Planned and implemented the flowcharts and spreadsheets needed to
monitor and control the management process with compliance to the company
regulations and USA Government regulations. § Led meetings with subject matter experts in the design and
construction team before WBS implementation and during the project phases. § Handled contract administration, claims, change orders, and bids
analysis with the client and subcontractors. Jun 2004 - Oct 2006; Assistant Project Manager /
Contract Administrator, Contrack International Inc. Client:
US Army Corps of Engineers, Afghanistan IDIQ Design/Built Contract, barracks construction
using the 3D Panels techniques, Roadways network, water and wastewater
treatment plans. The value of the project was over $200M. The construction
team consisted of 25 expatriates and 1,500 local Afghans. FCEC subcontractor
in MEPS project by Jalabad Rd. § Planned and scheduled workflow for each operation according to
established sequences and lead times. § Updated progress status, implemented and compressed time schedules
using Primavera, CPM, PERT. § Followed up with the demining company the blue prints for the project
scheduled to be ready for construction, then mobilizations of the staff and
the housing in Qalat site. Dec 2001-Dec 2003; Project Engineer, Pacer
Consulting, Port Said New City § Designed highways AASHTO, including field data gathering and
conversion of information to road cross sections and profiles using AUTOCAD. § Utilized AutoCAD software to design horizontal and vertical alignments
as well as prepare design plans. Used the Softdesk software for planning and
designing highways. § Designed for grading, land planning, site layout,
drainage, utility design, earth work, civil site, earth cut and fills. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Farsi |
Beginner |
|
|
French |
Beginner |
|
|
Spanish |
Intermediate |
|
|
|